Project Phases
Phase 1A
A 104,100 sq mt terminal area will have the capacity to handle 5 million passengers per annum. Within it, will be a 17,000 sq mt technical services zone situated below the arrival level and a 1750 sq mt external circulation area at the departure level.
Remaining buildings, including the ATC, technical section, cargo (100,000 tonnes capacity), aircraft maintenance, airport maintenance, CFR station and utilities, will have a combined area of 35,000 sq mts
Phase 1B
Post Phase 1A, construction of subsequent phases will be determined by actual traffic volume. Phase 1B will have a capacity increase to 7 million passengers per annum, by adding passenger boarding bridges and aircraft stands on the north side of the pier. A VIP terminal, facility for General Aviation (GA) and a Low Cost Terminal (LCT) for 0.3 million passengers per annum will also be built.
Phase 1C
Capacity of the terminal will be further increased to 10 million passengers per annum with an additional area of 37,000 sq mts. The LCT capacity will also be increased to 0.5 million passengers per annum and additional maintenance facilities, catering and offices will be provided 40,000 sq mts of space
Phase 2
Terminal 1 is now approaching full development and therefore, needs to be expanded to an area of 250,000 sq mts. The LCT will also be expanded to its full capacity of 1.5 million passengers per annum
A second runway will be needed before the construction of Terminal 2 can commence. A major increase in all the established facilities will be undertaken, including more hotels, offices, cargo and maintenance facilities. Total built up area at the end of this phase will be approx. 470,000 sq mts.
Final Phase
The airport has reached its full maturity. An additional floor area of 430,000 sq mts will be constructed bringing the total built up area to 900,000 sq mts.
The ultimate master plan is for 40 million passengers per annum. To accomodate this potential increase, the present master plan allows freedom of expansion for both airside and landside facilities within the Airport site. Further acquisition of land to the north and south will allow expansion of a third and fourth runway system.