guys thanks for the input
what about the UPS though, i believe i need it to protect the rig,( we have very much a japan like situation in bangalore, rolling blackouts w/o the earthquakes, thankfully).
i enquired with ashirwad APS ups costs 4.5K
also i want a graphics card which wont be obsolete...